I spent the
majority of this week working on A
Midsummer Nights Dream, when creating my plan I should have taken into
consideration how much of my time this would take up and because of this I
didn’t achieve as much as I had planned however I did manage to get a lot of
work done considering I was at the theatre assisting in wardrobe and dressing
for the majority of the week. I did get work done on my hat and I have begun to
block the brim and I have stretched the main part of the hat. I spent several
days in the dye room with Bethany to create a recipe for my 3PO waistcoat, as
the fabric needs to be dip dyed. I then managed to cut out and dye my fabric on
Friday. I am happy with how they dying has taken and I have shown it to the
designer and she is also happy with it. I will need to paint into the dye to
create the effect in the design but this will happen at a later date. Whilst I was at the theatre I managed
to get uni work done in between dressing. I have finished the trousers for 3PO
to the photo shoot stage; I just have to wait for the lining to be dyed by the supervisor
before I can add this to the trousers. I also need to speak to a tutor on
finishing methods. I also spent time working on my BE trousers and I have also
managed to finish these completely; I now need to remove the tacking and press
them. All I have to do now is complete the jacket and the first part of my EMP
project will be complete. This week had been so busy I haven’t had much time to
keep up with my theory work however I feel that I am on top of it. I have
managed to work on PPP organising the photos for my portfolio, complete my CV and
designing my business cards. Next week I am going to push my self to work hard
and I feel that if I keep to the pace I have worked this week, without the
pressure of MSND I will be able to get a lot done.
No comments:
Post a Comment