The day started with alterations of several costumes, I took
in Peter’s waiters waistcoat and ragamuffin shorts as well as lowering
Christopher’s trousers at the back. I also helped with pressing and prepping
for the show. The dress rehearsal went smoothly and all our quick changes went
well. I help with several different quick changes in the corridor and backstage
I stitch Zangler’s sleeve back onto his military jacket after it has been
pulled off. After the rehearsal we got all the actors out of costumes,
fabreezed all the shirts and tumble dyed them, went through any notes on
remaining changes and completed them, ironed the shirts and prepped the rails
for the opening show. This was very busy and but we worked as a team and
managed to get the majority of alterations completed before we got the actors
back into costume. The show went well and we were all now happy with the
routine of the production. After the show we tidied up and prepped the costumes
for the next day.
I feel that everything is going well and it is really nice
to be working on a live production and interacting with the actors. I am
learning lots throughout this production and I like the fact that I have made
for it then dressed. I am really looking forward to seeing a run of the
production now to see how it has all come together.
No comments:
Post a Comment